  • Inexpensive Bathroom Real-Life Makeover

    Inexpensive Bathroom Real-Life Makeover

    lg_01

    The first four pictures(1,2,3,4), show the original bathroom, which will receive a real-life makeover™. Not being the proprietors of the appartment the makeover will have to achive a balance between quality and frugality. To minimize costs the original walls and tiles, which are in good condition will be saved and, tiled over, instead of torn down.

    lg_02

    After removing the medicine cabinet, counter-top, heater, moldings and doors, we decided to replace the original razor outlet with an electrirical outlet with a saftey breaker and move it inside the cabinet, (Picture,5). Using a drywall saw Picture,6), the original medicine cabinet
    cut out was enlarged to accomidate the new larger cabinet. Highly recomended that if you decide to build your own medicine cabinet, or purchase a new one, make sure at least one shelve has enough clearence to allow for a tooth brush in its stand.

    lg_03

    lg_04

    Click here for the medicine cabinet real life makeover™. The original tile was then lightly sanded and throughly cleaned with a heavy duty cleaner. Then the vanity was cleaned, primed/painted, a middle shelve added, and both shelves covered with covering from Ikea, (Picture,7). The music speaker wires were also run around the door frame, behind the tile  and under/around the counter, (Picture,7,8), so later speakers maybe added to the bathroom.

    lg_05

    lg_06

    The tiling was completed using adhisive starting from the bottom up. Make sure the first row of tile is straight, errors will get magmified as the works progresses.(There could be exceptions when the first row of tile may not be perfectly straight, this is fine, if done intenssionaly.) Make sure the proper adhisive for tile on tile, not tile on wall /floor is used.

    The counter top came from an old Ikea table top that was trimmed to measure using a circular
    saw,(Picture,9). A jigsaw and drill were used for the sink cutout, which we then turned into a cutting board. Once the top was properly trimmed, the underside received two coats of stain/ protection. The topside also received two coats of stain/protection, followed by a light sanding (220 sandpaper), before appling a third coat,(Picture,9). We highly recomended to lightly sand after the second and before any thrid coat of stain or paint. The top was then secured to the vanity, (Picture,10) and the tileover completed.

    lg_07

    lg_08

    Once the tiles are firmly set. Using a grout filler begin filling in the spaces between the tiles. When mixing the filler add water a small amout at a time until the filler achives the
    consistiensy of wet dough. Apply the filler a small area at a time and wipe off the excess filler imidiately, before moving on to the next area. Once the tilling is all completed wash all residu off. Then the walls were painted using a kitchen/bathroom paint, and the newly built medicine
    cabinet securly screewed into the cut out on the wall.
    lg_09
    This being the only bathroom in th apartment, the hardware was placed as soon as possible.
    The towel rack, toilet paper holder, ethermastat, light switches, sink and facet were updatd
    and greatly added to the final look. Their total cost for the hardware was just over $110.
    The quality of the fixtures greatly determin the finished look of any makeover, therefore
    always purchase
    wisely but try to purchase the best quality you can afford. For an example of the importance of hardware, see how changing an inexpensive handle on a toilet, completely upgrades the look, click here.

    lg_10

     

     

     

  • Quick and Inexpensive Small Bedroom Closet Makeover

    Quick and Inexpensive Small Bedroom Closet Makeover

    image-of-original-closet
    Three images of the original closet

    The flat’s decent-sized master bedroom featured a small, disproportionately sized closet, oddly also home to the apartment’s hot water tank.

    Three guidelines guided the small bedroom closet’s real-life makeover.

    1. The unit is a rental; therefore, keep expenses to a minimum.
    2. For the reason above, cannot displace the hot water tank.
    3. The residence’s two large hallway closets will store coats and winter boots.

    The original layout had a single rod across the front, with the rear area and a shelf above the rod used for general storage.

    We decided to maximize the left wall area and the space around the water tank. The left wall was divided into three parts, two rods and a sliding-out pants rack from Ikea.

    Mail room pigeon hold shelf used in the project -real-life-makeover
    Mail room pigeon hold shelf used in the project

    We used a salvaged mail room pigeonhole shelf for the area around the water tank, which received two coats of white paint.

    The closet was emptied, cleaned, primed, and underwent two coats of satin gloss paint. Once the freshly painted walls dried, we installed the shelf, cut it into smaller sections to fit around the water heater.

    Ikea pant rack, 2 clothes racks and shelves installed real-life-makeover
    Ikea pant rack, 2 clothes racks and shelves installed.

    With the shelf securely in place, we then attached the two rods plus the pants rack onto the opposite wall. Unfortunately, the closet’s width did not allow for the slide-out hanger to slide forward, so the right-side support rail was removed using a metal cutting saw.

    The hanger was secured directly onto the drywall studs using two large screws (Yellow arrow). It is important to securely attach rods and racks to a wall stud or use appropriate size wall anchors.

    Studs run along a wall from floor to ceiling 16 or 24 inches apart, measured from center to center. A stud finder would help to locate studs. 

    Below are the before and after makeover images.

    Completed small bedroom closet real-life makeover
    Completed small bedroom closet real-life makeover™